All walls are now constructed, a bit of adjustment is needed to get them fitting but other than that I can start preparing for the rock work stage.
I will proceed by adding styrene to the base and walkway as these will adjust the shape of the rock work,
and I still need to sand the acrylic tube to the correct size once this is done the left wall can be stuck together.
I'm happy with my progress and happy with my model at this stage, though more important stages and more testing processes are ahead in this project I'm confident that the result will be impressive.
I am lacking in research especially for the rock work stage, which is looming so this will be my priority for the coming week.
To do :
- Research (rock work)
- Sand Acrylic tube to correct sizes
- Cut out necessary pieces of styrene (walkway, base, top left hand corner)
- Sand semi-circle and clad so tube fits
- Complete left wall (stick together, add support for walkway)
- Decide on two top tanks themes (email David again)
- Cut yellow foam to correct sizes and shape