From my last post I have started to clad the model in styrene and the acrylic tube has been cut and sand to make the underwater walkway.
The acrylic tubing looks very affective and fits well however there are a few gaps. These gaps are at the base of the tubing at the joints and will be covered up by a styrene wall that I had already planned to add.
I have also started a small sketch model for the rock work stage to see how it will fit and look.
This is a very small model but has helped me to identify areas of concern for example some gaps a way to small on this model and that the base of the rock work will need to be sculpted carefully to look realistic. This model is missing the top part of the rock work (less eroded part).
Jobs to do
- Construct back of walls
- Consolidate idea for top tanks
- Continue Research on rock work
- Add styrene to all areas necessary
- Finish sketch Model
No comments:
Post a Comment